   Highway Division Updates
   Last week , the Highway Division:
   Repaired potholes on Ahwaga Street , Bernache Street , Hillcrest Drive , Middle Street , Sheffield Lane , Stilson Avenue and Stowell Street
   Removed , repaired and/or replaced signs on King Street and Ryan Road
   Removed concrete blocks from Elm Street
   Lovefield Street remains closed
   Annual ward street sweeping operations:
   Continue in Ward 1
   Complete in Wards 2 , 3 , 4 and 5
   Wards will be swept in the following order this year: 5 , 4 , 3 , 2 , 1 , 7 , 6
   To report a pothole , please submit a request via the
   Pothole Repair Form
   ; the largest potholes are filled first to alleviate hazards to vehicles; as hazards arise and are identified , they will be addressed
   To report an issue with a traffic sign , please submit a request via the
   Traffic Sign IssueForm
   Dryads Green Extension Drainage & Slope Improvements
   The City has contracted with Geeleher Enterprises Inc . to construct drainage and slope improvements from the end of Dryads Green Extension to the Mill River; work also includes roadway drainage improvements
   The project is substantially complete
   Snow storage should be avoided at the dead end so as not to compromise slope integrity
   Public Works will be on - site continuing post - construction observations throughout the winter
   I - 91 Bridges over Route 5 , the Railroad and Hockanum Road
   MassDOT has contracted with J . F . White , Inc . to construct roadway improvements to I - 91 and at Exit 23 ( formerly Exit 18 )
   The project will replace the I - 91 bridges over Route 5 , the Railroad and Hockanum Road and construct safety and signal improvements at the exit interchange
   The project is scheduled to be completed in phases by 2025
   The Contractor will not be working on Monday , January 1st
   I - 91 southbound:
   Daytime
   right lane closureTuesday through Friday this week , from 7:00 a . m . to 2:00 p . m . , for site access
   I - 91 northbound:
   No traffic impacts are anticipated this week
   Route 5:
   Daytime
   shoulder closuresTuesday through Friday this week , from 7:00 a . m . to 3:00 p . m . , for concrete and slope work; motorist should be alert and use caution as trucks will be entering and exiting the work zone; police details will assist with traffic control
   Hockanum Road:
    
   Daytime road closureTuesday through Friday this week , from 7:00 a . m . to 2:00 p . m . ; a
   detour ( pdf ) will be in place
   Questions about the project should be directed to
   MassDOT District 2
    , project #606552
   Levee Toe Drain Improvements
   The City has contracted with Ludlow Construction Co . , Inc . for the installation of manholes along the land side of both the Connecticut and Mill River levee systems
   The project involves the installation of 28 new manholes and inspection of the toe drains running parallel to the levees via CCTV
   The Contractor will make a pipe repair to a section of toe drain at the end of Henry Street in the coming weeks
   Linden Street Sewer Manhole Installation
   The City has contracted with Geeleher Enterprises Inc . to install a sewer manhole on Linden Street in the vicinity of 2 Linden Street
   The Contractor has installed the new sewer manhole and a temporary pavement patch
   Work is substantially complete
   Maplewood Terrace Sewer Manhole Installation
   The City has contracted with Geeleher Enterprises Inc . to install a sewer manhole on Maplewood Terrace in the vicinity of 120 Maplewood Terrace
   The Contractor has installed the new sewer manhole and a temporary pavement patch
   Work is substantially complete
   State Street Sewer Service Repair
   The City has contracted with Geeleher Enterprises Inc . to repair two sewer services and a sinkhole in the vicinity of 245 State Street
   The Contractor will also install a temporary pavement patch
   Work is substantially complete
   Winter Street Reconstruction
   The City has contracted with Caracas Construction Corporation for the full depth reconstruction of Winter Street , including water & sewer mains and service connections and sidewalks
   The project is substantially complete
   Public Works and/or the Contractor will be on - site continuing post - construction inspections throughout the Fall
   Projects to resume Spring 2024
   Damon Road Reconstruction
   Leeds Pressure Reducing Valve
   Levee Vegetation Management
   Locust Street & SVAHS Drainage Improvements
   An overview of all current Public Works projects can be found by going to
   Current Projects
    .
   Sign up for automatic notifications via the
   Notify Me systemon the City ' s website . Please sign - in ( at the top of the page ) and then subscribe to the "Public Works" category under
   News Flash ( at the bottom of the page ) .
   

PLAY the NEWS

* May be useful for visually impaired persons .



Press release information :
Direct link to press release: Click here .

Keywords and search queries from search engines related to the press release :
Tags:
Street . Construction . Massachusetts . Northampton . January . December . Highway . Division . Updates . Division .
closuresTuesday . closureTuesday . Reconstruction . Massachusetts . substantially . notifications . Construction . Improvements . observations . installation .
https://thepressreleaseengine.com/Construction+for+the+Week+of+January+1st+-lnid2023-4260-419199
Street ; Construction ; Massachusetts ; Northampton ; January ; December ; Highway ; Division ; Updates ; Division ;
closuresTuesday ; closureTuesday ; Reconstruction ; Massachusetts ; substantially ; notifications ; Construction ; Improvements ; observations ; installation ;
Division Updates Division Highway December January Northampton Massachusetts Construction Street
installation observations Improvements Construction notifications substantially Massachusetts Reconstruction closureTuesday closuresTuesday

Was this page helpfull ?


Advertisment

Similar

Northampton
Local news- Press Release

Northampton Massachusetts : Construction for the Week of January 1st

Northampton , state Massachusetts

Highway Division Updates Last week , the Highway Division: Repaired potholes on Ahwaga Street , Bernache Street , Hillcrest Drive , Middle Street , Sheffield Lane , Stilson Avenue and Stowell Street Removed , repaired and/or replaced signs on King Street and Ryan Road Removed concrete blocks from Elm Street Lovefield Street remains closed Annual ward street sweeping operations: Continue in Ward 1 Complete in Wards 2 , 3 , 4 and 5 Wards will be swept in the following order this year: 5 , 4 , 3 , 2 , 1 , 7 , 6 To report a pothole , please submit a request via the Pothole Repair Form ; the largest potholes are filled first to alleviate hazards to vehicles; as hazards arise and are identified , they will be addressed To report an issue with a traffic sign , please submit a request via the Traffic Sign IssueForm Dryads Green Extension Drainage & Slope Improvements The City has contracted with Geeleher Enterprises Inc . [ . . . ]

Northampton
Local news- Press Release

Northampton Massachusetts : Annual Holiday Tree Collection Events

Northampton , state Massachusetts

The Northampton Department of Public Works will be offering two collection dates in January for holiday tree recycling . Trees should be brought to the front , right parking lot of Smith Vocational High School , located at 80 Locust Street , on Saturday , January 6 , 2024 and/or Saturday , January 13 , 2024 . [ . . . ]

Northampton
Local news- Press Release

Northampton Massachusetts : Picture Main Street Campaign Naming Contest

Northampton , state Massachusetts

For Immediate Release - January 3 , 2024 "Name That Campaign" Contest Invites Community Creativity to Support Main Street Businesses During Picture Main Street Construction NORTHAMPTON – As Northampton prepares for the dynamic Picture Main Street construction project , set to commence in the fall of 2025 , the city , in partnership with the Greater Northampton Chamber of Commerce ( GNCC ) and the Downtown Northampton Association ( DNA ) , is keenly focused on the essential role of supporting our local Main Street businesses during this upcoming period of positive transformation . [ . . . ]

Northampton
Local news- Press Release

Northampton Massachusetts : Construction for the Week of January 8th

Northampton , state Massachusetts

Highway Division Updates Last week , the Highway Division: Repaired potholes on Garfield Avenue , Indian Hill , Loudville Road and Sylvester Road Removed , repaired and/or replaced signs on College Lane , Elm Street , Maple Street , Musante Drive and West Street Prepared for impending winter storm Lovefield Street remains closed Annual ward street sweeping operations: Continue in Ward 1 Complete in Wards 2 , 3 , 4 and 5 Wards will be swept in the following order this year: 5 , 4 , 3 , 2 , 1 , 7 , 6 To report a pothole , please submit a request via the Pothole Repair Form ; the largest potholes are filled first to alleviate hazards to vehicles; as hazards arise and are identified , they will be addressed To report an issue with a traffic sign , please submit a request via the Traffic Sign IssueForm Dryads Green Extension Drainage & Slope Improvements The City has contracted with Geeleher Enterprises Inc . [ . . . ]

Tags:
Street . Construction . Massachusetts . Northampton . January . December . Highway . Division . Updates . Division .
closuresTuesday . closureTuesday . Reconstruction . Massachusetts . substantially . notifications . Construction . Improvements . observations . installation .
https://thepressreleaseengine.com/Construction+for+the+Week+of+January+1st+-lnid2023-4260-419199
Street ; Construction ; Massachusetts ; Northampton ; January ; December ; Highway ; Division ; Updates ; Division ;
closuresTuesday ; closureTuesday ; Reconstruction ; Massachusetts ; substantially ; notifications ; Construction ; Improvements ; observations ; installation ;
Division Updates Division Highway December January Northampton Massachusetts Construction Street
installation observations Improvements Construction notifications substantially Massachusetts Reconstruction closureTuesday closuresTuesday
1
1